 |
Energiewerke Nord,
Lubmin,Germany |
| |
Pumping of residue
from thermal groundwater treatment through a filter |
| |
|
 |
Cooling water removal,
Germany |
| |
Removal of cooling
water from a drainage ditch |
| |
|
 |
Riebel concrete plant,
Freimar, Germany |
| |
Installation of
multiple pumps in the recycling system of the concrete plant |
| |
|
 |
Moosach subway tunnel,
Munich, Germany |
| |
Renovation of the
U3 between the Olympia shopping centre and Moosach |
| |
|
 |
Rupp gravel plant,
Dillingen, Germany |
| |
Preparation/clarification
of rinse water from gravel processing |
| |
|
 |
Höllberg A38 tunnel,
Thüringen, Germany |
| |
Autobahn A38,
Breitenworbis-Bleicherode section - construction of the Höllberg
tunnel |
| |
|
 |
Badische Stahlwerke,
Kehl, Germany |
| |
Pumping of
abrasive and cinder-loaded water |
| |
|
 |
Renovation of
underground parking garage, Munich, Germany |
| |
Pumping of jet
water with residual water pumps off concrete surface |
| |
|
 |
Free training sessions,
Germany |
| |
Performance of
free training for new and existing customers |
| |
|
 |
AZS ARGE
Zugangsstollen, Linthal, Switzerlandl |
| |
Access shafts II -
Kraftwerk Linth-Limmern AG - “Project Linthal 2015” |
| |
|
 |
NEAT Amsteg and
Erstfeld construction sites, Switzerland |
| |
New Transalpine
Railway (NEAT), Amsteg and Erstfeld construction sites |
| |
|
 |
Zagreb Arena,
Croatia |
| |
Construction of
the Zagreb Arena for the 2009 Handball World Championship |
| |
|
 |
Iron deposition, Zwolle,
Holland
|
| |
Deposition of iron
using a submersible aerator in Zwolle, Holland |
| |
|
 |
Construction of a
shopping centre in Oslo, Norway |
| |
Construction of a
shopping centre at the Port of Oslo |
| |
|
 |
Caisson tunnel, Oslo,
Norway |
| |
Construction of a
tunnel using caissons |
| |
|
 |
Vinterbro tunnel,
Norway |
| |
Tunnel on the E6
South section between Vinterbro and Assurtjen, 3605 m in length |
| |
|