| |
|
Safety
gallery, Lugano Tunnel, Switzerland
|
| |
|
|
| The project:
Construction of 2,400m long escape
gallery to the Lugano road tunnel. The tunnel connects the northern districts of
the city to the motorway exit Lugano Nord.
Executing company:
Hochtief Construction AG
Muttoni Bellinzona Co.
RL Pumpenanlagen GmbH (Tsurumi partner)
Commissioned by: Canton Ticino
The problem:
Drainage via open dewatering during tunnelling operations.
|
| |
|
|
 |
| |
|
|
| The
solution:
Implementation of several
KTZ and KTV series submersible pumps which can be operated in 24-hour
snore mode due to their construction type.
|
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, agitator,
suction plate, shaft sleeve, oil ring, mechanical seal, pump casing,
strainer, motor casing and discharge coupling. Depending on the working
conditions the lifetime of those parts might vary significantly and can
be shorter than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|