| |
|
Henndorf
Tunnel, Austria
|
| |
|
|

|
|
The project: Construction
of a road tunnel for by-passing Henndorf.
Executing companies:
Wayss&Freytag Ing. Bau AG
Held&Francke Baugesellschaft mbH&Co.KG
Habau Hoch- u. Tiefbaugesellschaft mbH
Sonnek Engineering GmbH (Tsurumi partner)
The problem:
Drainage via open dewatering during tunnelling operations.
|
| |
|
|
The solution:
Implementation of multiple KTZ and KTV series submersible pumps which
can be operated in 24-hour snore mode due to their construction type.
|
|

|
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, agitator,
suction plate, shaft sleeve, oil ring, mechanical seal, pump casing,
strainer, motor casing and discharge coupling. Depending on the working
conditions the lifetime of those parts might vary significantly and can
be shorter than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|