Danube
power plant, Asten, Austria
|
| |
|
|

|
|
The project: Installation
of a drain pump for the turbine inspection chamber.
Executing companies:
Verbund Austrian Hydro Power AG
Sonnek Engineering GmbH (Tsurumi partner)
The problem:
For inspection work the turbine must be completely drained at the intake
and discharge including the headrace tunnel. New turbines are integrated
in the collector shaft. Depending on the inspection cycle, the
unfiltered water from the Danube must be pumped away there.
Pump requirement: 300m3/h at 3bar. Until now clean water submersible
pumps were implemented which were always at risk of silting.
|
| |
|
|
The solution:
Implementation of a type LH845 high-pressure pump with a 45kW rating.
This conveys the existing pressure line at a pressure of 2.8bar 5m3/min.
Tsurumi contractors’ pumps are perfectly suited for dirty media which
means that they can also be operated after flooding (extreme silting).
 |
|

|
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, agitator,
suction plate, shaft sleeve, oil ring, mechanical seal, pump casing,
strainer, motor casing and discharge coupling. Depending on the working
conditions the lifetime of those parts might vary significantly and can
be shorter than the legal warranty period.