Intermediate access gallery, Stelzen, Germany
|
| |
|
|

|
|
The project: Construction
of the Stelzen intermediate access gallery during the building of the
Blessberg railway tunnel.
Executing company:
Alfred Kunz Untertagebau GmbH
The problem:
Tunnel drainage under difficult conditions: long adits with a minimum of
available space.
|
| |
|
|
The solution:
Type KTZ35.5 pumps were installed in the pipeline as booster pumps. This
special solution can be easily implemented with any of our standard
contractors’ pumps.
Thanks to the simple construction and the patented oil lifter, Tsurumi
contractors’ pumps can run dry absolutely trouble-free. The minimal
cooling due to the flowing medium is sufficient. |
|

|
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, agitator,
suction plate, shaft sleeve, oil ring, mechanical seal, pump casing,
strainer, motor casing and discharge coupling. Depending on the working
conditions the lifetime of those parts might vary significantly and can
be shorter than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|