Richmann-Muller, Belgium |
| |
Replacement of a
defective wastewater pump station in a residential house |
| |
|
 |
Best Carwash, Germany |
| |
Pumping off
process water from an industrial car wash |
| |
|
 |
Intermediate access
gallery, Stelzen, Germany |
| |
Tunnel drainage
under difficult conditions |
| |
|
 |
Katzenberg Tunnel, Germany |
| |
Treatment and
desludging of the process water from the tunnel advance |
| |
|
 |
Schmücketunnel,
Germany |
| |
Section of the A71
with two pipes each 1720m and 1729m respectively |
| |
|
 |
Training at construction sites,
Germany |
| |
Training courses
for independent repair and maintenance of pumps |
| |
|
 |
La Praz Tunnel, France |
| |
Construction of a
52km long railway tunnel between France and Italy
|
| |
|
 |
Kepag Longford, Ireland |
| |
Pumping off
wastewater in a meat processing facility |
| |
|
 |
Whelans Quarry, Ireland |
| |
Dewatering in a
quarry with differences in height of up to 60m |
| |
|
 |
Truck
wash, Luxemburg |
| |
Operation of a
high-volume truck wash |
| |
|
 |
Corus Tubes, Netherlands |
| |
Circulation of
cooling water with abrasive content for the fabrication of pipes |
| |
|
 |
Hubertustunnel, Netherlands |
| |
Construction of a
city tunnel in The Hague with a diameter of 9.6m and a length of
1,490m |
| |
|
 |
Concrete factories of the Mebin Co.,
Netherlands |
| |
Operation of
contractors pumps in recycling tanks in continuous use |
| |
|
 |
Residential building in
Haugesund, Norway |
| |
Dewatering during
the construction of a residential building |
| |
|
 |
Danube power plant at Asten, Austria |
| |
Installation of a
drain pump for the turbine inspection chamber |
| |
|
 |
Henndorf Tunnel, Austria |
| |
Construction of a road
tunnel for by-passing Henndorf |
| |
|
 |
Port promenade in Zurich, Switzerland |
| |
Reconstruction and
expansion of the port promenade on Lake Zurich |
| |
|
 |
Safety gallery, Lugano Tunnel,
Switzerland |
| |
Construction of an
escape gallery to the Lugano road tunnel |