The project: ARGE Tunnel
Grouft, Lorenzweiler, Luxemburg
Executing companies:
Wayss & Freytag Ingenieurbau AG,
Max Bögl Bauunternehmung GmbH & Co. KG
Societe de Travaux Galere s.a.
Tralux s.a.r.
Felix Giorgetti s.a.r.
|
| |
|
|
|
An
approximately three km long tunnel is being built north of the city of
Luxemburg. It is part of the new section of the “Route du Nord” and
consists of two tunnels from which one three-lane and one two-lane
tunnel have a gradient of almost 4,5%. The tunnelling work is being
performed using conventional construction methods and explosives. The
tunnel connects the Heeschdrëfferbierg plateau in the south and the
Alzettetal near Lorentzweiler in the north. This will create a section
connecting to the important north-south track in Luxemburg.
The problem:
Open drainage
during tunnelling and construction in the open with the help of
submersible pumps.
|
|

|
| |
|
|
 |
|
Our solution: Producing a
drainage concept. Types used:
KTZ22.2, KTZ32.2, KTZ45.5, KTZ47.5, LH25.5W
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller,
suction plate, shaft sleeve, oil ring, mechanical seal, pump casing,
strainer, motor casing and discharge coupling. Depending on the working
conditions the lifetime of those parts might vary significantly and can
be shorter than the legal warranty period.