Tunnel Tröingeberg,
Sweden
|
| |
|
|
| The project:
Torebro-Heberg Tunnel
Tröingeberg, Sweden
two-lane railway tunnel, tunnel length: 1.160 m
Executing companies:
Per Aarsleff Bygg- och Anläggnings AB
Beton & Monierbau Gesellschaft.m.b.H
The problem:
Drainage with the help of
submersible pumps in preliminary section and during the tunnel drive.
Our solution:
Type KTZ32.2 and KTZ45.5
pumps are used.
|
| |
|
|
|

|
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller,
suction plate, shaft sleeve, oil ring, mechanical seal, pump casing,
strainer, motor casing and discharge coupling. Depending on the working
conditions the lifetime of those parts might vary significantly and can
be shorter than the legal warranty period.