Nibelungen Bridge Worms,
Germany
|
| |
|
|

|
|
The project:
New building of second Rhine
Bridge
Executing company:
Max Bögl Bauunternehmung GmbH & Co. KG
The new bridge project, built 36 metres away from the old bridge, is a total of
745 metres in length. The section over the Rheinstrom is 322 metres long.
|
| |
|
|
|
The problem:
Pumping off the water and concrete
mixture created in the course of boring piles that are 900mm in diameter at a
depth of up to 50m into the ground for soil stabilization.
Our solution:
Use of a KTZ411 Tsurumi
pump for securing the boring piles during the casting phase. The unit is
used to pump out the mixture of water and concrete. |
|

|
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller,
suction plate, shaft sleeve, oil ring, mechanical seal, pump casing,
strainer, motor casing and discharge coupling. Depending on the working
conditions the lifetime of those parts might vary significantly and can
be shorter than the legal warranty period.