tunnel Katzenberg, Germany
|
| |
|
|

Two parallel tunnels, each 9.385 metres in length, single-shell segment
lining, tunnelling using two Herrenknecht EPB tunnelling machines.
|
|
The project: Part of the
expansion and new Karlsruhe-Basle section to provide access to the New
Transalpine Rail (NEAT).
Executing companies:
Wayss & Freytag Ingenieurbau AG
E. Züblin Tunnelbau AG
Marti Tunnelbau AG
Jäger Bau GmbH

|
| |
|
|
|
The problem: Open water
drainage using submersible pumps to the tunnel portals and during
tunnelling operations.
Our
solution:
Use of Tsurumi submersible
sewage pumps for complete drainage. Pump series used: KTZ, KTV, KRS with
agitator. |
|

|
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, agitator,
suction plate, shaft sleeve, oil ring, mechanical seal, pump casing,
strainer, motor casing and discharge coupling. Depending on the working
conditions the lifetime of those parts might vary significantly and can
be shorter than the legal warranty period.