Gotthard
Basistunnel, Switzerland
|
| |
|
|

|
|
The project:
Railway Tunnel Alptransit Gotthard,
Sedrun Section
Executing companies:
ARGE Transco Sedrun
Batigroup AG Tunnelbau,
Frutiger AG
Bilfinger Berger AG,
Impresa Pizzarotti & C.S.p.
The “Sedrun
Section” of the Gotthard Basistunnel encompasses two tunnels that are
each 6,2 kilometres long and supplied through a 800m deep mine shaft.
Two tunnels are at the base of the shaft and each breaks through to the
north and south in the conventional manner.
|
| |
|
|
|
The project tunnels
through the unstable rock of the Tavetscher Zwischenmassiv with an up to
2.000m overlay. One of the two multifunctional sections of the 57 km
long Gotthardbasis Tunnel is also being built in the Sedrun section.
The problem:
Pumping off
the abrasive water that collects during the tunnelling excavations.
|
|

|
| |
|
|
 |
|
Our solution: Use of the
current 80+ Tsurumi wastewater submersible pumps for complete drainage.
Pump series used: KTZ, KRS, KTV, LH, KRS with agitator.
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, agitator,
suction plate, shaft sleeve, oil ring, mechanical seal, pump casing,
strainer, motor casing and discharge coupling. Depending on the working
conditions the lifetime of those parts might vary significantly and can
be shorter than the legal warranty period.