Tunnel Wienerwald, Austria
|
| |
|
|

|
|
The project: ARGE
Wienerwaldtunnel, Chorherrn, Austria
Executing companies:
Porr Tunnelbau GmbH
Bilfinger Berger Bauges. M.B.H
Bilfinger Berger AG
Porr Technobau und Umwelt AG
Ed. Züblin AG
Hochtief Construction AG
Jäger Bau GmbH
Swietelsky Baugesellschaft m.b.H.
|
| |
|
|
In the course of expanding
the western railway, OBB Infrastruktur Bau AG is building a 42,3km long
section of rail between Vienna and St. Pölten.
The approximately 13,35km long Wienerwald Tunnel comprises a
significant part of this newly built section and connects the western
edge of Vienna (Hadersdorf-Weidlingau) with Tullnerfeld.
The opening of the complete Wienerwald Tunnel as part of the newly built
section between
Vienna and St. Pölten is planned for 2012. |
|

|
| |
|
|
 |
|
The
problem:
Open drainage during
tunnelling and construction in the open using submersible pumps.
Our solution:
Use of the
following pump types: KTV2-22,
KTV2-37, KTZ22.2, KTZ32.2, KTZ45.5, KTZ47.5, LH25.5W
Advantages of Tsurumi pumps:
- longer operating life
- lower replacement parts costs
|
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller,
suction plate, shaft sleeve, oil ring, mechanical seal, pump casing,
strainer, motor casing and discharge coupling. Depending on the working
conditions the lifetime of those parts might vary significantly and can
be shorter than the legal warranty period.