home
company profile
contractors' pumps
sewage pumps industrial pumps
application reports references
general conditions of sales
press releases
  contact
  The Tsurumi Technical Library
  legal notice
  deutsche versionversion française
   


 
 

 
 

 

  
 

Tunnel Weißenburger Street, Dortmund

     

  The Project:

Construction of an underground railway tunnel with a length of 130 m, descending heading with a partial cut machine.

Executing companies:
ARGE Tunnel Weißenburger Straße, Dortmund
Wiemer & Trachte AG
Alpine Bau Deutschland GmbH

The Problem:

Drainage during the tunnel heading work.

     
Our Solution:

Use of submersible pumps of the KTZ series which can reliably ensure drainage in 24-hour snore mode during the heading work.

 

 


Portal with partial cut machine in operation

     


Collecting shaft with KTZ47.5 and KTZ35.5 in operation in snore mode

     
In the event of abrasive and corrosive utilization, stronger wear and tear will take place naturally in certain components. With regards to the above application wear and tear can take place mainly in impeller, agitator, suction plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer, motor casing and discharge coupling. Depending on the working conditions the lifetime of those parts might vary significantly and can be shorter than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also send to you by mail on request.