Tunnel U2/2, Vienna, Austria |
| |
|
|
|
 |
|
The
Project:
Construction of an underground railway tunnel with a length of 1500 m.
Executing companies:
ARGE Tunnel U2/2 Taborstraße, Vienna, Austria
Östu-Stettin Hoch- und Tiefbau GmbH
G. Hinteregger &Söhne Bauges.m.b.H.
Wayss&Freytag Ingenieurbau AG
The Problem:
Drainage of the underground tunnel heading with the aid of submersible
pumps. |
| |
|
|
| Our
Solution:
Use of submersible pumps of the KTV series which can reliably ensure
drainage in 24-hour snore mode during the heading work.
Thanks to their special properties including their internal rotating
mechanical seal and upstream shaft protection sleeve with seal, the
Tsurumi pumps can be operated in 24-hour snore mode.

|
|

The advantages of
this design are:
-Extended
service lives
-Lower costs for spare parts
-Lower labour costs |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer,
motor casing and discharge coupling. Depending on the working conditions
the lifetime of those parts might vary significantly and can be shorter
than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|