Tunnel Siegkreisel, Betzdorf |
| |
|
|
|
 |
|
The
Project:
Construction of a 360 m long tunnel with three lanes as component of a
municipal bypass system; completion: Spring, 2006.
Executing companies:
ARGE Tunnel Tunnel Siegkreisel, Betzdorf
Hochtief Construction AG
Kirchner Bau GmbH
Alpine Bau Deutschland GmbH
The Problem:
Pumping off of the water arising during the underground tunnel heading. |
| |
|
|
| Our
Solution:
Use of submersible pumps of type KTZ32.2, these being operated in
permanent snore mode (dry running) during the complete construction
period. This application is no problem for the pump thanks to the
patented oil distributor in combination with the rotating mechanical
seal, which is located completely internally. |
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer,
motor casing and discharge coupling. Depending on the working conditions
the lifetime of those parts might vary significantly and can be shorter
than the legal warranty period.