Remediation, wastewater sewer, Cologne |
| |
|
|
|
 |
|
The
Project:
Remediation of a wastewater sewer, stormwater treatment SKO 405 Cologne
Executing company:
F.C. Trapp Tief- und Straßenbau Köln GmbH
The Problem:
Pumping of the wastewater arising during the 8month construction period
including complete construction and laying out of a DN 250 pressure line
with a
length of 1200 m including overpasses and transverse sections.
|
| |
|
|
| Our
Solution:
Three wastewater pumps of type 100C411 with non-clog impeller with
cutter were used. The special impeller comminutes solid matter that
arises so that blockages cannot occur. Operational reliability held the
highest priority here. |
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer,
motor casing and discharge coupling. Depending on the working conditions
the lifetime of those parts might vary significantly and can be shorter
than the legal warranty period.