Tunnel Brixlegg, Austria |
| |
|
|
|
 |
|
The
Project:
Construction of a 4,200 m long railway tunnel
Executing company:
ARGE H2 Tunnel Brixlegg
Porr Tunnelbau
G. Hinteregger &Söhne
Bilfinger & Berger AG
Östu Stettin |
| |
|
|
| The
Problem:
Open drainage during the tunnel heading. The ARGE H2 Tunnel Brixlegg is
building the 4,200 m long railway tunnel in a construction time of 20
months. In order to keep to this schedule, up to five headings will be
worked at the same time. The 2,276 m long exploration gallery, which was
completed in 2001, serves in part for supplying the headings. In the
course of the work the exploration gallery will be enlarged to serve as
a rescue gallery. In addition the creation of a 330 m long access
gallery from the centre of Brixlegg is planned. Crosscuts at intervals
of 500 m are being constructed.
|
|
 |
| |
|
|
 |
|
Our
Solution:
Use of submersible pumps of type KTZ32.2, these operating in 24-hour
snore mode.
Thanks to their special properties including their internal rotating
mechanical seal and upstream shaft protection sleeve with seal, these
Tsurumi pumps can be operated in 24-hour snore mode.
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer,
motor casing and discharge coupling. Depending on the working conditions
the lifetime of those parts might vary significantly and can be shorter
than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|