| |
|
|
ARGE
Tunnel Achrain, Austria |
| |
|
|
|
 |
|
The
Project:
Construction of a 3,200 m long road tunnel
Executing companies:
ARGE Tunnel Achrain/Österreich
Beton- u. Monierbau Gesellschaft m.b.H.
Alpine Mayreder Bau GmbH
Jäger Bau GmbH
The Problem:
Drainage during the complete tunnel heading work. |
| |
|
|
| Our
Solution:
Use of type KTZ32.2 submersible pumps. These are operated in 24-hour
snore mode.
Thanks to their special properties including their internal rotating
mechanical seal and upstream shaft protection sleeve with seal, the
Tsurumi pumps can be operated in 24-hour snore mode.
The advantages of this design are:
-Extended service lives
-Lower costs for spare parts
-Lower labour costs |
|

KTZ32.2 in snore mode |
| |
|
|
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer,
motor casing and discharge coupling. Depending on the working conditions
the lifetime of those parts might vary significantly and can be shorter
than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|