Augustaburg tunnel, Erfurt |
| |
|
|
|
 |
|
The
Project:
Construction of a railway tunnel with a length of
1480 m.
Executing companies:
ARGE Tunnel Augustaburg, Erfurt
Hochtief Construction AG, Frankfurt
Alpine Bau Deutschland GmbH
The Problem:
Drainage during the underground tunnel heading . |
| |
|
|
| Our
Solution:
A
Use of type KTZ32.2 submersible pumps operated in 24-hour snore mode for
drainage purposes during the tunnel heading. Thanks to their special
properties including their internal rotating mechanical seal and
upstream shaft protection sleeve with seal, the Tsurumi pumps can be
operated in 24-hour snore mode.
The advantages of this design are:
-Extended service lives
-Lower costs for spare parts
-Lower labour costs |
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer,
motor casing and discharge coupling. Depending on the working conditions
the lifetime of those parts might vary significantly and can be shorter
than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|