Project:
Construction of the
road tunnel B236n in Dortmund-Berghofen
Executing company: Bilfinger Berger AG
The Problem:
Open dewatering during the underground tunnel heading and also
cut-and-cover work with the aid of submersible pumps. |
| |
|
|
| Our
Solution:
Pumps of types KTZ32.2, KTZ45.5 and KTV22.2 were used. Continuous snore
mode and the possibility of dry running are possible with Tsurumi pumps
and secure driving at this construction site.
Figure above: Dumper in the tunnel
Figure on right: Shaft ring dewatering |
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer,
motor casing and discharge coupling. Depending on the working conditions
the lifetime of those parts might vary significantly and can be shorter
than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|