ICE
railway track Airport
Cologne-Bonn |
| |
|
|
|

|
|
The
project:
Underground railway track for linking Cologne-Bonn airport
Executing companies:
Consortium Flughafenanbindung
Köln/Bonn Los3
E. Heitkamp GmbH
Wayss & Freytag Ingenieurbau GmbH
Bauer Spezialtiefbau GmbH
F.C. Trapp AG
Dewatering with 24-h pump duty by::
Smet GWT N.V., Dessel, Belgium
Biergans Pumpen-Vertrieb GmbH, Duisburg |
| |
|
|
| The
problem:
Pumping off the water arising during underground tunnel heading,
lowering the ground water level over a large area.
Our solution:
Deep wells were built in the area in which submersible waste water pump
were installed. This allowed to lower the ground-water table to the
lowest possible level. |
|

|
| |
|
|
|

|
|
from top:
Fig. 1:
Tunel entrance Hermann-Lönsstraße, 1st section of excavation.
Fig. 2:
KTZ32.2 for sludge pumping |
| |
|
|
|
Fig. 3:
Support of the drain line by a pipe bridge, 2nd section of excavation.
Fig. 4:
View into the tunnel, 3rd section of excavation |
|

|
| |
|
|
|

|
|
Fig. 5, on left:
Water drainage with KTZ23.7 on snore mode. |
| |
|
|
|
Fig. 6, on right:
Water drainage with KTZ67.5 on snore mode, installation in drainage
collection shaft. |
|

|
| |
|
|
|

|
|
Fig. 7, on left:
Well pump LH23.0W installed in deep well on snore mode |
| |
|
|
|
Fig. 8, on right:
Tunnel exit Kriegerstraße, view in direction towards airport |
|

|
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer,
motor casing and discharge coupling. Depending on the working conditions
the lifetime of those parts might vary significantly and can be shorter
than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |