Gotthard basetunnel, Sedrun |
| |
|
|
|
 |
|
The
project:
Railway tunnel Alptransit Gotthard, building lot 360
Executing companies:
Consortium Transco-Sedrun
Batigroup AG Tunnelbau
Frutiger AG
Bilfinger Berger AG NL Tunnelbau
Impresa Pizzarotti & C.S.p.A. |
| |
|
|
| The
problem:
Pumping off the water arising during mined tunnel heading. The
extraordinary challenge of the 'Sedrun section' with two parallel
tunnels each 6.2km long is the penetration of zones of extreme
geological difficulties and the supply to the building site through a
mine shaft 800m deep. |
|


sludge to be pumped |
| |
|
|
|
 |
|
At
the foot of these shafts two parallel tunnels are driven using
conventional methods to the north and to the south.
The tunnels are driven through rock of the Tavetscher Massif having
little stability with 2000m capping, making the work extremely
difficult. In addition, one of the two multi-function stations of the
57km long Gotthatd basetunnel will be constructed within the Sedrun
section. |
| |
|
|
| Our
solution:
Application of so far 15 Tsurumi submersible waste water pumps for
draining.
Pump series used: KTZ, KRS, KTV, LH
From top:
Fig. 1: View into the shaft
Fig. 2: KRS2-100 for sludge pumping
Fig. 3: KTV2-37 flying pump in the area of the tunnel front
Fig. 4: KTZ47.5 in collecting basin |
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, agitator,
suction plate, shaft sleeve, oil ring, mechanical seal, pump casing,
strainer, motor casing and discharge coupling. Depending on the working
conditions the lifetime of those parts might vary significantly and can
be shorter than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|