Syphon construction under
nature reserve Löcknitztal
by micro-tunnelling |
| |
|
|
|
 |
|
The
project:
Pipe heading DN 1600 by micro-tunnelling with reinforced concrete
driving pipes for passing under the nature reserve Löcknitztal near
Kienbaum (Land Brandenburg) as protective pipe for a high-pressure gas
pipeline DN 1100.
Client:
Ruhrgas AG/Verbundnetz Gas AG
Executing company:
Gildemeister Tief-, Stahlbeton- und
Rohrleitungsbau GmbH&Co. KG Berlin
|
| |
|
| The
problem:
Pumping off the supporting liquid (bentonite suspension) used in the
tunnel during pipe heading.
Our solution:
Application of a submersible pump Type KTZ35.5 connected with an
accompanying pipe line DN 100 for continuous removal of the supporting
liquid during the whole time of pipe heading.
The pump was always positioned at the lowest point of the syphon and
operated on snore mode.
|
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer,
motor casing and discharge coupling. Depending on the working conditions
the lifetime of those parts might vary significantly and can be shorter
than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|