Tunnel project U3, Munich |
| |
|
|
|
 |
|
The
project:
Construction of underground tunnel line 3 North, lot 1
Execution companies:
Consortium U-Bahn Linie 3 Nord
Ed. Züblin AG, Ndl. Tunnelbau
Ed. Züblin AG, Ndl. München |
| |
|
|
| The
problem:
Pumping off the water arising during mined underground tunnel heading. |
|
 |
| |
|
|
 |
|
Our
solution:
Use of 9 submersible waste water pumps of Type KTZ32.2.
Because of the highly calcareous water deposits occur in the pump
hydraulics resulting in pump blocking. However, due to the mechanical
seal positioned completely inside und the additional shaft protection
sleeve with sealing ring the pump can be put quickly with little effort
and without exchanging any wear parts back into operation again. |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer,
motor casing and discharge coupling. Depending on the working conditions
the lifetime of those parts might vary significantly and can be shorter
than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|