Consortium Kleine Emscher, Duisburg |
| |
|
|
|
 |
|
The
project:
Micro-tunnel pipe heading DN3200/80m
DN 2400/600m and DN1400/120m
Executing companies:
Echterhoff GmbH & Co. KG
F.C. Trapp Tief- u. Straßenbau GmbH
The problem:
Pumping off or drainage of the arising ground water containing sand
during pipe heading by open dewatering. |
| |
|
|
| Our
solution:
The arising ground water is pumped off with a KRS-69 pump, including all
the sand contained. A 24-h on snore mode operation must be ensured. |
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer,
motor casing and discharge coupling. Depending on the working conditions
the lifetime of those parts might vary significantly and can be shorter
than the legal warranty period.