| |
|
|
City
railway tunnel, Bochum |
| |
|
|
|
 |
|
The
project:
City railway tunnel building lot 306
Executing companies:
Beton- und Monierbau Ges.mb.H
Heitkamp Rail GmbH
The problem:
Pumping off the water arising during mined underground heading. |
| |
|
|
| Our
solution:
Use of submersible waste water pump Type KTZ32.2.
Figure above:
Terraced finish of the roof section.
Figure on right:
KTZ32.2 on snore mode at the breast. |
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer,
motor casing and discharge coupling. Depending on the working conditions
the lifetime of those parts might vary significantly and can be shorter
than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|