Tunnel Burgholz, Wuppertal

     

  The project:

Construction of a tunnel for road traffic
Executing companies:
Consortium Tunnel Burgholz
Baresel AG, NL Tunnelbau
G. Hinteregger & Söhne Baugesellschaft m.b.H

 

The problem:

Pumping off the water arising during underground tunnel heading.

     
Our solution:

Application of 25 Tsurumi submersible waste water pumps of series KTZ and KTV and KRS with agitator.

Figure above: KTZ45.5 in snore mode installed in traverse heading between the south and the north tunnel.

Figure on right: The final length of the southern tunnel is 1865m, that of the northern tunnel is 1787m.

 

     
In the event of abrasive and corrosive utilization, stronger wear and tear will take place naturally in certain components. With regards to the above application wear and tear can take place mainly in impeller, agitator, suction plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer, motor casing and discharge coupling. Depending on the working conditions the lifetime of those parts might vary significantly and can be shorter than the legal warranty period.