Tunnel Burgholz, Wuppertal |
| |
|
|
|
 |
|
The
project:
Construction of a tunnel for road traffic
Executing companies:
Consortium Tunnel Burgholz
Baresel AG, NL Tunnelbau
G. Hinteregger & Söhne Baugesellschaft m.b.H
The problem:
Pumping off the water arising during underground tunnel heading. |
| |
|
|
| Our
solution:
Application of 25 Tsurumi submersible waste water pumps of series KTZ
and KTV and KRS with agitator.
Figure above: KTZ45.5 in snore mode installed in traverse heading
between the south and the north tunnel.
Figure on right: The final length of the southern tunnel is 1865m, that
of the northern tunnel is 1787m. |
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, agitator,
suction plate, shaft sleeve, oil ring, mechanical seal, pump casing,
strainer, motor casing and discharge coupling. Depending on the working
conditions the lifetime of those parts might vary significantly and can
be shorter than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|