ICE
railway track
Airport Cologne-Bonn |
| |
|
|
|
 |
|
The
Project:
Underground railway track to link the Cologne-Bonn airport, Germany
Executing companies:
Consortium Airport tunnel Cologne-Bonn lot 3
Wayss & Freytag Ingenieurbau AG,
E. Heitkamp GmbH, F.C. Trapp AGComplete dewatering (24h-duty) carried
out by:
Smet GWT N.V., Dessel, Belgien
Biergans Pumpen-Vertrieb GmbH, Duisburg |
| |
|
|
| The
Problem:
Open dewatering by means of submersible pumps.
Our Solution:
The groundwater generated is pumped off by several submersible pumps for
abrasive water. 24-h on-snore-operation must be ensured. Currently a
total of twenty KTZ21.5 and ten KTZ32.2 is in operation. |
| |
|
|
|
 |
|
 |
|
View to the railway track
in
direction ICE station |
|
KTZ21.5 - well pots with
submersible pumps |
| |
|
|
 |
|
 |
|
Well
pot with KTZ32.2 |
|
KTZ21.5 - dewatering by a drainage system |
| |
|
|
 |
|
 |
|
KTZ21.5 - dewatering and
drainage collection system |
|
KTZ21.5 - installed in a drainage system
to dewater the railway track |
| |
|
|
 |
|
 |
|
KTZ32.2 - dewatering in front of
the existing tunnel entrance |
|
KTZ21.5 - horizontal, in on-snore-mode |
| |
|
|
 |
|
 |
|
LB2-400 - minor dewatering when sealing the
walls by means of small 1-phase submersible pump |
|
LSC-4
residual water pump |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring and mechanical seal. Depending on the
working conditions the lifetime of those parts might vary significantly
and can be shorter than the legal warranty period.