ICE
railway station
Cologne-Bonn Airport |
| |
|
|
|
 |
|
The
Project:
ICE
railway station Cologne-Bonn Airport lot C, Germany
Executing company:
Bilfinger Berger AG
Complete dewatering (24h pump duty) carried out by: Biergans
Pumpen-Vertrieb GmbH, Duisburg |
| |
|
|
| The
Problem:
Open dewatering using submersible pumps.
Our Solution:
Draining the excavation pit at the head and tail structure.
Currently, one KTV2-37, three KTZ32.2 and two KTZ67.5 are in continuous
operation. |
| |
|
|
|
 |
|
 |
|
Exit of railway station
KTZ67.5 horizontal position,
24h-on-snore-mode |
|
Exit
of railway station
KTZ67.5, 24h-on-snore-mode |
| |
|
|
 |
|
 |
|
Entrance of railway station
KTZ67.5, 24h-on-snore-mode |
|
Entrance of railway station
KTZ67.5 in countinuous operation |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring and mechanical seal. Depending on the
working conditions the lifetime of those parts might vary significantly
and can be shorter than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |