ICE railway station Cologne-Bonn Airport

     

  The Project:

ICE railway station Cologne-Bonn Airport lot C, Germany
Executing company:
Bilfinger Berger AG
Complete dewatering (24h pump duty) carried out by: Biergans Pumpen-Vertrieb GmbH, Duisburg

     
The Problem:

Open dewatering using submersible pumps.

Our Solution:

Draining the excavation pit at the head and tail structure.
Currently, one KTV2-37, three KTZ32.2 and two KTZ67.5 are in continuous operation.

     

 

Exit of railway station
KTZ67.5 horizontal position,
24h-on-snore-mode

 

Exit of railway station
KTZ67.5, 24h-on-snore-mode

     
 

Entrance of railway station
KTZ67.5, 24h-on-snore-mode

 

Entrance of railway station
KTZ67.5 in countinuous operation

     
In the event of abrasive and corrosive utilization, stronger wear and tear will take place naturally in certain components. With regards to the above application wear and tear can take place mainly in impeller, suction plate, shaft sleeve, oil ring and mechanical seal. Depending on the working conditions the lifetime of those parts might vary significantly and can be shorter than the legal warranty period.