Extension of connection road L639
in Gelsenkirchen |
| |
|
|
|
 |
|
The
Project:
Extension of the connection road L639,
Florastraße Gelsenkirchen
Executing company:
Heitkamp Erd- und Straßenbau GmbH
The Problem:
Repumping a mixed water channel because a shaft had to be installed. |
| |
|
|
|
Our Solution:
Two Tsurumi KRS822 pumped off the dammed water. 720 m³/h were re-passed
into the mixed water channel at a distance of 100 m.
This took 3 weeks where the pumps were in service 24 h a day without any
failure.
The pumps were laid into the bed of the channel without further
installation. No problem for Tsurumi pumps. |
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring and mechanical seal. Depending on the
working conditions the lifetime of those parts might vary significantly
and can be shorter than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|