| |
|
|
Airport link Cologne/Bonn |
| |
|
|
|
 |
|
The
Project:
Underground railway track to link the Cologne/Bonn Airport, Germany
Executing companies:
Consortium airport link Cologne/Bonn lot 3
Wayss&Freytag AG, E. Heitkamp GmbH,
Bauer Spezialtiefbau GmbH, F.C. Trapp AG
The Problem:
A
DB400 sewage water pipeline has to be installed through the progressing
soil excavation |
| |
|
|
| Our
Solution:
To
re-pump the dirty water generated, submersible pumps for abrasive water
of the types KRS65.5 and KTZ45.5 were installed in the existing shaft.
Installation includes all hose connections and the emergency generator. |
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring, mechanical seal and strainer. Depending
on the working conditions the lifetime of those parts might vary
significantly and can be shorter than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|