| |
|
|
Bramschstraße tunnel - Dresden, Germany |
| |
|
|
|
 |
|
The
Project:
North-tangent Dresden-Gorbitz, Bramschstraße tunnel, Germany
Executing Company:
MAX BÖGL Group of companies
Postfach 1120
D-92310 Neumarkt
info@max-boegl.de
www.max-boegl.de
The Problem:
The tunnel lies in the ground water over its whole length. No free water
table exists near the tunnel, the flow-in quantities depend on the
distribution of the local flow quantities from top and vertical joints
which extend as far as the main ground water course. |
| |
|
|
| Our
Solution:
KTZ35.5 is used in 24-hour pumping on snore mode. Because cement sludge
and abrasive media are pumped here it is necessary to apply a highly
wear resistant pump. |
|

|
| |
|
|
|
After
11 months of operation (November 2000 till September 2001) the pump did
not show any major sign of wear: |
| |
|
|
|
 |
|
 |
| |
|
|
 |
|
 |
| |
|
|
 |
|
 |
| |
|
|
|

the oil is clear as
before |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring and mechanical seal. Depending on the
working conditions the lifetime of those parts might vary significantly
and can be shorter than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm)
that we
also send to you by mail on request. |
|