| |
|
|
Essen
Grugapark, Germany |
| |
|
|
|
 |
|
The
Project:
New construction of Essen Grugapark, Germany
Executing Company: Hochtief Building
Equipment provided by Streif Baulogistik
The Problem:
The ground water and collected surface water must be pumped off. |
| |
|
|
| Our
Solution:
The water is pumped off via a 200m long hose line by a KTZ45.5 which is
installed horizontally for space reasons.
Sufficient capacity reserves are available even in case of heavy
rainfall. |
|
 |
| |
|
|
|
 |
| |
|
|
In the
event of abrasive and corrosive utilization, stronger wear and tear will
take place naturally in certain components. With regards to the above
application wear and tear can take place mainly in impeller, suction
plate, shaft sleeve, oil ring and mechanical seal. Depending on the
working conditions the lifetime of those parts might vary significantly
and can be shorter than the legal warranty period.
In this regard, please pay attention to our
general conditions of sales
(www.tsurumi-europe.com/english/GCS.htm) that we also
send to you by mail on request. |
|